This exploratory opinion aims to analyse how the EU can improve the integration, reliability and sustainability of its energy infrastructure.

More specifically, the opinion looks into measures to modernise grids, promote smart technologies, expand interconnections and support investment in innovative storage and transmission solutions. It also examines how to overcome regulatory and technical barriers that slow down progress.

The end goal is to guarantee future energy security by building, on the one hand, a more integrated and resilient European energy system and by increasing, on the other, cooperation with neighbouring region.

Stronger energy interconnectivity is essential to achieve: 1) energy security 2) lower energy prices and 3) the EU’s decarbonisation targets.

Energy interconnectivity is also important in the framework of the New Pact for the Mediterranean and the India-Middle East-Europe Economic Corridor (IMEC), which is meant to connect the EU and the Middle East.

 

Key points

The EESC:

  • stresses that the European electricity sector must have the capacity to plan the needs of the electricity system at EU level and in partner countries, based on a common energy scenario set out by the Commission and national system operators.
  • underlines that interconnections can only be effective if they are accompanied by the development of the relevant national infrastructures, especially at Transmission System Operators (TSO) and Distribution System Operators (DSO) levels. The creation of interconnection capacity must be an opportunity to foster European solidarity regarding electricity networks.
  • prioritises the security of the electricity system, concerning climate change impacts, physical attacks, acts of sabotage, cyber risks and system balancing risks.

Additional information

Section: Transport, Energy, Infrastructure and the Information Society (TEN)

Opinion number: TEN/865

Opinion type: Exploratory opinion Presidency

Rapporteur: Christophe Béguinet (Group II - France)

Date of adoption by section: 3 February 2026

Result of the vote: 81 in favour, 0 against, 1 abstention

Date of adoption in plenary: 18-19 February 2026

Result of the vote: 235 in favour, 4 against, 4 abstentions

 

Contact

Marco Pezzani

Press Officer

Tel.: +32 2 546 9793 | Mob: +32 470 881 903

E-mail: marco.pezzani@eesc.europa.eu

 

Giorgia Bordignon

Administrator

Tel.: +32 546 8535

E-mail: giorgiaandrea.bordignon@eesc.europa.eu

Recommended for you

  • Energy connectivity, electricity grids

    Opinion

    Key pointsThe EESC:stresses that the European electricity sector must have the capacity to plan the needs of the electricity system at EU level and in partner countries, based on a common energy…

  • Europe’s Electricity Grids are a competitiveness test, not a technical detail

    News

    When European employers look at their balance sheets today, electricity is no longer a background cost item: it is a strategic variable that can decide whether investments stay in Europe or move…

  • The EU’s electricity grids must be strong, smart and secure

    News

    At its March plenary session, the European Economic and Social Committee (EESC) stressed that the EU needed more decentralised energy and better coordination on electricity grids. Networks should be…

  • European Grids Package

    News

    BackgroundThe European Union has one of the most extensive and resilient electricity networks in the world. It spans over 11 million kilometres across its internal market and ensures that high…

  • European energy grids: between economic security and strategic autonomy

    News

    In recent years, the discussion on Europe’s energy transition has focused almost exclusively on renewable energy generation: more wind farms, more solar panels, more green energy. This transformation…